Zur Navigation | Zum Inhalt

     
 
Other EU Funded Gas Turbine Projects

The following projects on 'More Efficient Gas Turbines' are funded by the European Commission.

You will be able to prepare for a conference on gas turbines very quickly if you use https://buy-essays-now.com/

Further details can be found on the Cordis website.

1. Advanced long life blade turbine systems
Project Reference: ENK5-2000-00081 Project Acronym: ALLBATROS
Status: Execution Duration: 48 months
 
2. Completion Of The Arbre Plant With The Typhoon Gas Turbine
Project Reference: NNE5/20065/1999 Project Acronym: ARBRE-TYPHOON
Status: Execution Duration: 24 months
 
3. 43% Electric Efficient Gas Turbine In Winter Operation For Nancy District Heating And National Grid Electricity Supply
Project Reference: NNE5/20089/1999 Project Acronym: BOUSSYDISTRICTHEATIN
 
4. Thematic network for cleaner and more efficient gas turbines
Project Reference: ENK5-2000-20062 Project Acronym: CAME-GT
 
5. Centres Of Excellence For Industrial Gas Turbines
Project Reference: NNE5/391/2001 Project Acronym: CE-IGT
 
6. Research and development of high efficiency components for an intercooled, recuperated CHP gas turbine for combined heat and efficient power
Project Reference: ENK5-2000-00070 Project Acronym: CHEP

Status: Execution

Duration: 30 months

 
7. CMC integration and demonstration for gas turbine engines
Project Reference: ENK5-2000-00068 Project Acronym: CINDERS

Status: Execution

Duration: 48 months

 
8. Design and off-design optimisation of highly loaded industrial gas turbine stages

Project Reference: ENK5-2000-00065

Status: Execution

Project Acronym: DAIGTS

Duration: 36 months

 
9. Design And Demonstration Of Highly Reliable Low NO[x] Combustion Systems For Gas Turbines
Project Reference: NNE5/388/2001 Project Acronym: DESIRE
 
10. Development of innovative techniques for compressor aero-mechanical design

Project Reference: ENK5-2000-00086

Status: Execution

Project Acronym: DITCAD

Duration: 36 months

 
11. Flame sensors for efficient gas turbine engine cycles

Project Reference: ENK5-2000-00115

Status: Execution

Project Acronym: FLAMESEEK

Duration: 36 months

 
12. Low NOx flox combustor for high efficiency gas turbines

Project Reference: ENK5-2000-00114

Status: Execution

Project Acronym: FLOXCOM

Duration: 36 months

 
13. Demonstration Of A Low NO[x] Fuel-staged Combustor In A High Efficiency Gas Turbine Target Action F: Gas Power Generation
Project Reference: NNE5/382/2001 Project Acronym: FUELCHIEF
 
14. Thermo-economic optimisation of whole gas turbine plant

Project Reference: ENK5-2000-00079

Status: Execution

Project Acronym: GTPOM

Duration: 24 months

15. Combined cycle power plant with integrated low temperature heat

Project Reference: ENK5-2000-00063

Status: Execution

Project Acronym: LOTHECO

Duration: 30 months

 
16. Demonstration Of A Nano-precipitate Hardened Ferritic Welded Steel Rotor In A High Efficiency Gas Turbine Target Action F: Gas Power Generation
Project Reference: NNE5/375/2001 Project Acronym: NANOROTOR
 
17. Prediction and control of combustion instabilities for industrial gas turbines

Project Reference: ENK5-2000-00060

Status: Execution

Project Acronym: PRECCINSTA

Duration: 42 months

 

 

 


 
     
Free Joomla! Templates provided by funky-visions.de